The following video demonstrates that the Final Wind Turbine Design works and produces electricity with wind produced by 2.0 mph wind. From this point, the Project is now in the Final Phase where final calculations are being made and a sturdy base is being located.
Video: Final Design in Operation
Currently, the team is creating the Final Report as well as a video demonstration of the Final Wind Turbine Design. Each team member is responsible for a portion of the Final Report to be completed by June 1st.
No comments:
Post a Comment